Delivery and installation

Planning the home and the site together.

A successful modular-home installation depends on access, preparation, foundations, delivery and properly coordinated service connections.

Discuss your property

A modular home installed in an Australian backyard

The installation pathway

Six practical stages from planning to handover.

The exact responsibilities and sequence depend on the home, property and quotation. These stages show the areas that normally need to be coordinated.

01 · REVIEW

Home and site information

Confirm the preferred design, property location, intended use and known access or service constraints.

02 · DOCUMENT

Approvals and planning

Identify the documentation, engineering, council, planning and building-certification requirements that apply.

03 · PREPARE

Site and foundations

Complete required clearing, earthworks, drainage, footing or foundation work and prepare the delivery area.

04 · DELIVER

Transport and placement

Coordinate the delivery route, unloading or crane requirements, positioning and access for installation crews.

05 · CONNECT

Plumbing and electrical

Licensed trades connect approved water, wastewater, power and other services to the installed home.

06 · COMPLETE

Checks and handover

Finish required inspections, testing, certificates, commissioning and the agreed handover process.

Service connections

Qualified trades and property-specific planning matter.

Connections must suit the approved design and local requirements. The relevant work should be completed and certified by appropriately licensed professionals.

Electrical supply

Connection route, switchboard requirements, capacity, metering and any alternative-energy components need to be confirmed for the property.

Water and hot water

Available supply, pressure, connection distances and the selected hot-water system can influence the installation scope.

Wastewater and stormwater

Sewer, septic or other approved wastewater solutions, plus roof-water and site drainage, must be planned for the property.

Internet and other services

Data, gas or additional services should be discussed early if they need to be incorporated into the preparation or connection work.

Before delivery day

Questions worth checking early.

Resolving these items before manufacturing and transport helps reduce surprises when the home is ready to move.

  • Can the delivery vehicle reach the placement area?
  • Are gates, turns, trees and overhead services clear?
  • Are foundations and the set-down area ready?
  • Have service routes and connection points been confirmed?
  • Are required approvals and inspections in place?
  • Does the quotation clearly assign each responsibility?
Important: Installation requirements vary by property and local authority. Confirm the approved design, scope of work, licensed trades and certification requirements before beginning site work or ordering services.