Construction case study · Macleay Island
L-Shaped Grevillea Modular Home Build
A behind-the-scenes look at the light-gauge steel framing, two-module layout and early site works for this Grevillea modular home project.
Frame manufacturing
The build begins with accurately prepared steel components and prefabricated wall sections. Openings, structural bracing and connection points are formed before the frames move to the property.



Module One takes shape
The first module establishes the main structural form. External wall frames, roof members, insulation wrap and internal room divisions are assembled as one coordinated system.




Building the second module and L-shaped connection
Module Two forms the return of the L-shaped plan. The framing sequence reveals how the two sections align while allowing the internal spaces, openings and junctions to be assembled with precision.




Construction video
Watch Modules One and Two take shape
The cover is ready. We will activate the video here as soon as its hosted link is available.
Septic installation and site services
The modular home is only one part of a complete property project. Approved wastewater system installation forms part of the broader site-services work on Macleay Island.



Project update: This home is shown during construction. Final finishes and completed-home photographs will be added as work progresses.
Planning a modular home?
Talk with us about your site, preferred layout and the steps involved.